Abraj Lulu

Maintenance of chiller, pumps, air handling unit & BMS system. MAINTENANCE CONTRACT OF ABRAJ AL LULU (45 STORY 3 TOWER) & PLATINUM TOWER Client Elite Facility Management Company Date Dec 2018 Total TR 7500

Read More

Platinum tower

Supply, install and commissioned chilled water system, BMS, mechanical fire-fighting system, toilet ventilation, treated fresh air system, stare cause pressurization system, and car park ventilation. PLATINUM TOWER(28-storey Commercial Building at Seef) Client Mohammed Ahmed Dadabhai/ GEMAC Date 2011 Total TR 1100

Read More

Elite crystal hotel at juffair

Supply, install and commissioned chilled water system, BMS, mechanical firefighting system, toilet ventilation, treated fresh air system, stare cause pressurization, Kitchen ventilation system, and car park ventilation. ELITE CRYSTAL HOTEL at JUFFAIR Client Al Sharafs Engineering Date 2012 Total TR 870

Read More

GALLERIA SHOPPING COMPLEX INCLUDING LULU MALL

Supply, install and commissioned chilled water system, BMS, mechanical firefighting system, toilet ventilation, treated fresh air system, stare cause pressurization system and car park ventilation. GALLERIA SHOPPING COMPLEX INCLUDING LULU MALL Client GOYS/ Aref Sadiq Design Date Mar 2017

Read More

JUFFAIR HEIGHTS

Air condition with the packaged unit, treated fresh air unit, ducted split unit, mechanical firefighting,  kitchen ventilation, car park ventilation, and toilet ventilation system. JUFFAIR HEIGHTS Client Pegasus/ GEMAC Date Oct 2017

Read More